ABB PVS300 Manuale Pagina 24

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
Vedere la pagina 23
24 Operation basics and hardware description
1. As the sun rises, the inverter wakes up when there is enough daylight for the solar
modules to generate DC voltage in excess of the minimum inverter operating limit.
2. After waking up, the inverter verifies the status of the power line and then
switches to the normal operating mode.
3. During operation, the inverter feeds current to the power line, and monitors both
the solar arrays (DC) and power line (AC).
4. As the sun sets, the inverter enters sleep mode when there is insufficient daylight
to generate DC voltage in excess of the minimum inverter operating limit. The
inverter uses the AC power supply to keep the control unit working when the DC
voltage is too low (night time).
Vedere la pagina 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 129 130

Commenti su questo manuale

Nessun commento