ABB FPBA-01 Manuale Pagina 108

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 134
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 107
Starting up fieldbus communication and programming the ABB PLC (multi-axis system)
108
6. Drag and drop CM572-DPM on the green line. In the netConnect-Driver
Parameter dialog box, select 1 for the Board no: box. This is because the CM572-
DP communications module is installed next to the CPU on the left-hand side in the
installation example of this manual.
7. Drag and drop the FPBA-01 DP-V0 two times on the purple line.
Tool/Step
Setting up the communication
Vedere la pagina 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 133 134

Commenti su questo manuale

Nessun commento